Installation
Figure 29. Line weight installed – B-frame compressors
Chillers with C, D, or E-Frame Compressor Size
Number of oil separator discharge lines: 2
Number of kits required: 2
Install 2 weights (4 clamps) on EACH of the two oil
separator discharge lines as shown in figure below.
Install on the "candy cane" line between the oil
separator and the condenser.
Mount just below the weld or on any smooth surface in
that area.
Figure 30. Line weight installation location – C, D, or
E-frame compressors
32
Figure 31. Line weight installed on C, D, or
E-frame compressors
RTHD Tracer AdaptiView UC800
Controls Upgrade
If there is an existing CH530 controller, the Tracer
AdaptiView™ RTHD rotary chiller display upgrade
kit (RCDA) must be installed. Follow the installation
instructions in RCDA-SVN001*-EN (Installation
Instructions: Tracer AdaptiView™ RTHD Rotary Chiller
Display Upgrade Kit) before installing the AFDR drive.
If the RTHD to be retrofitted to AFD already has a UC800
Tracer AdaptiView controller, that can be reused.
Important:
Regardless if it is new or existing, the UC800
must have a software upgrade to support
the AFDR. For more information, refer to
"UC800 Software Installation and
Configuration," p.

AFDR Kit Identification

Close Mount Kit 1 has two power wire harnesses
Close Mount Kit 2 has four power wire harnesses
Remote Mount Kit 3 has NO power wire harnesses or
Modbus™ cables
Note: The Modbus™ wiring for the remote mount
option must be purchased separately; refer to
"Required Parts—NOT Supplied," p. 24
numbers to determine the lengths needed.
Purchase appropriate lengths for the distance
required to wire to the AFD.
52.