Installation
4 Installation
4.1 Assemble the boiler
Lay all cables (temperature sensor, motor, lambda sensor, ...) in such a way that they do not touch the tank
raw body (where possible run above the insulation, or at a distance from the raw body).
Fig. 4-1
Fig. 4-2
10
Dismantling the intermediate pel-
let store
Dismantle the intermediate pellet
store
1
by loosening 2 x hex nuts
and washers 2.
, Dismantling the burner
Dismantle the burner
ing 4 x hex nuts and washers 2.
Installation manual octo
1
by loosen-
plus
Need help?
Do you have a question about the octo plus and is the answer not in the manual?