Summary of Contents for HunterDouglas VS 100 Guide rail
Page 1
INSTALLATION - MAINTENANCE VS 100 Guide rail VS 100 Wire...
Page 2
• Opening windows and doors may limit the possibility for installing screens. • The motor and any control equipment must be installed by an authorised electrician. VS 100 Guide rail - installing wall brackets and cassette Pull the tape through the drilled hole...
Page 3
VS 100 Installation - Maintenance Installation - Maintenance VS 100 Wire - Assembling wall brackets and cassette VS 100 Guide rail - installing cassette support (optional) Screw the cassette support (optional) Center the cassette above the window and to the wall.
Page 4
Screen Screen VS 100 VS 100 Installation - Maintenance Installation - Maintenance VS 100 Wire - Assembling the tensioning brackets VS 100 Wire -Interior tape operation Roll down the fabric to the desired bottom Center the cassette above the window. Mark position - assemble the tensioning brackets the bottom, left and right side.
Page 5
Screen Screen VS 100 VS 100 Installation - Maintenance Installation - Maintenance VS 100 Wire - Interior tape operation Finish the installation by carefully lower the front profi le to the desired end posi- tion - move the tassel to the top and make a knot directly under the tassel.
Need help?
Do you have a question about the VS 100 Guide rail and is the answer not in the manual?
Questions and answers