INSTALLATION
RAIL CROSS
PIN INSTALLATION
NOTE: Install rail cross pin after jack screw
has been properly tightened.
1.
At bottom end of rail (base of stairs), position
SRE Cross Pin Drill Template after first tooth
of first gear rack. Template hole should be up —
against the part of the extrusion covering the
gear rack (Fig. 1). Template "teeth" should fit
up against the gear rack valleys (Fig. 2).