Upper Rail Preparation - Bruno ELAN SRE-3050 Installation Manual

Hide thumbs Also See for ELAN SRE-3050:
Table of Contents

Advertisement

PRE-INSTALLATION
UPPER RAIL PREPARATION
1.
Place upper rail section on saw horses.
2.
Attach charge contact to the slow down
strip (Fig. 1).
|
3.
If previously removed, slide charge strip
"el
carrier into back side of rail.
sqqqueeRE
EE
aay
sete
sete
SepPetey sean
en
eee
4.
Slide charge contact assembly from Fig.
1 into back side of rail. Assembly will fit
snugly against charge strip carrier.
end of rail at this point.
5.
Using two (2) self-drilling
hex head screws, secure slow
down ramp to rail. See Fig. 2.
NOTE: Confirm that slow down ramp
is parallel to charge strip carrier,
and touching top edge of carrier.
Fig. 2
6.
Remove charge contact assembly from rail
and save for later use.
right-hand installation
7.
Mount final limit switch bracket:
e Upper edge of final limit switch bracket
-charge
should be flush with lower edge of charge
contact
contact.
e Insert a self-drilling hex head screw
through each screw hole on final limit
|
switch bracket into etched lines on back of
Fig. 3
rail (Fig. 3)
slow-down
strip
«
g