Emerson Keystone OM13 - EPI2 Installation, Operation And Maintenance Manual page 35

3-wires module
Hide thumbs Also See for Keystone OM13 - EPI2:
Table of Contents

Advertisement

Installation, Operation and Maintenance Manual
VCIOM-01495-EN Rev. 1
Alternatively, to avoid induced voltage phenomena over floating command line, the
following wiring diagram may be used.
Figure 56
NOTES:
1. Supply from 110 to 240 V AC / 1-ph
2. Contacts shown in intermediate position CLC1 - CLC2 end of travel signaling in CLOSING
3. Internal heater (max. 10 watt) is activated when a power supply from 110 to 240 V AC is connected to the
4. Output contact rating: 240 V AC / 5 A - 30 V DC / 5 A - 120 V DC / 0.5 A
OM13 Wiring Diagram
Blinker/
Monitor
Local Selector
Relay
Relay
(Note 1)
L2 neutral
When L1 - L2 - L3 cables are long (more than 10 metres) induced voltage phenomena may occur on
floating command line
To avoid this unwanted effect, realize a cabling system where unused line (either L1 OPEN or
L3 CLOSE) is pulled to NEUTRAL line. To do this, a switch may be used.
For example with the BACO PN NC02GQ1, the following configuration may be used:
short circuit
pins 1 and 3
short circuit
pins 5 and 7
short circuit
pins 2 and 8
short circuit
pins 4 and 6
pin 3 = PHASE
pin 5 = NEUTRAL (L2)
pin 2 = OPEN (L1)
pin 4 = CLOSE (L3)
Contacts shown in intermediate position OPC1 - OPC2 end of travel signaling in OPENING
terminals 33-344
USE TO AVOID INDUCED VOLTAGE PHENOMENA
CLC1
CLC2
OPC1
Output Contacts
(Note 2-4)
MODULE 13 (3-WIRES)
(Note 3)
Section 5: OM13 Wiring Diagram
OPC2
May 2022
31

Advertisement

Table of Contents
loading

Table of Contents