Installation Method
1. Apply a bead of low pressure intumescent mastic
along top edge of damper as a gap filler and Install
the damper against the floor slab and fasten using fire
rated steel fixings and a washer.
2. Frame out the damper using tracks and studs lined
with board. This is done with two vertical lined studs as
close to the damper as possible (outside the cleats) and
a lined cross track below the damper between the two
vertical studs and back fill with mineral/stone wool.
3. Build the partition to the track and stud framework,
coming as close to the damper as possible.
4. Insulate the wall with mineral/stone wool.
5. Seal the damper to the partition with intumescent
sealant and add pattresses to both sides down to the
damper spigot, seal to the damper spigot with intu-
mescent sealant. Fasten the pattresses with drywall
screws at 300mm centres on the sides and bottom
such that they will allow screws to pull into the stud




20220503 - LNNN00353 (5.0) Swegon reserves the right to alter specifications.

Actionair DWFX-C Installation Guide







A


and track around the hole. Fix the top pattress into the
track at the sides.
6. Finish the wall as standard practice.
7. A minimum of 200 mm between fire dampers installed
in separate ducts.
Stone wool min 33kg/m³
12.5mm gypsum fire
boards type F (EN520)
VERTICAL BLADES;
Damper can be installed with the blades in
the vertical orientation with the actuator
mounted at the bottom, refer to drawings
for cleat locations; standard DWFX-C =
AAF/0244DWFX-C actuator at bottom =
AA-SS-2001








Stone wool min 30kg/m³







Stone wool min 30kg/m³


12.5mm gypsum fire
boards type F (EN520)

© Swegon Air Manag
South Street, Whitstable
Tel: +44 (0)1227
Email: actionair@s
www.swegon.
Installation
If your proposed installation
that shown here, please dis
authority having jurisdiction
documentation.
Deviation from this drawing
of the relevant authority.
Connecting ductwork omitt
Ductwork must be indepen
There must be an appropri
joint between the damper a
ductwork on both sides of t
A minimum of 200mm betw
installed in separate ducts
fire damper and constructio
needs to be observed unle
specified in the drawing.
SC
Plea
for l
co
Inst
and
H
ECN2227
G
ECN5134
F
ECN1922
E
EC1919
D
EC1830
C
EC1770
Rev:
Comments:
Drawn By:
S. Wehrle
Kimberley.M
Checked By:
Gore.S
Approved By:
Description:
VERTICAL APP
SMOKE SHIELD D
PLASTERBOARD W
SUPPORTING CON
Damper Size Ra
200 x 200 to 10
Reference No:
AAF10730
1
5

Advertisement

Table of Contents
loading

Table of Contents