Section 4: Installation - Emerson Keystone OM9 - EPI2 Installation, Operation And Maintenance Manual

Profibus dpv1 interface
Table of Contents

Advertisement

Section 4: Installation

May 2022
Section 4: Installation
To assemble the OM9 into the EPI2 actuator, proceed as follows:
Figure 7
Figure 8
Follow one of the following assembling procedures depending on actuator model.
6
Ensure that all the parts received with the OM9 are available as described in
paragraph optional kits.
Using paragraph optional kits, select only mechanical parts (screws and spacers)
depending on actuator models.
Gather the right tools for the assembly and for setting the actuator controls.
With an Allen wrench of 5 mm, unscrew the cover screws, see Figure 7.
Remove the actuator cover, see Figure 8.
Installation, Operation and Maintenance Manual
VCIOM-01493-EN Rev. 0
Installation

Advertisement

Table of Contents
loading

Table of Contents