CPI 1184 Series Assembly Manual page 15

Table of Contents

Advertisement

CPI SATCOM & Antenna Technologies
Top of Reflector
Cross Arm
( TOP )
[ 14,15,16 ]
8 places
Cross Arm
( BOTTOM )
Top of Reflector
[ 13 ]
Reflector Support Tube
STEP 14:
A). Locate the top of the reflector and insert
(2) 5" bolts ( item 13 ) thru top two inner
most holes on face of reflector as shown.
STEP 15:
A). With a person on each side of the
[ 13 ]
reflector, lift the reflector up.
B). Position the reflector so that the (2) bolts
(step 14) pass thru the two inner holes
in the top cross arm.
C). Loosely attach 3/8 " hardware
(items,14,15,16). Note: the reflector is
fully supported at this time.
D). Insert the (2) remaining 5" bolts (item 13)
thru the remaining two holes on top of
reflector.
]
[ 12
E). Insert the (4) 4.5" bolts (item 12) thru the
four bottom holes in reflector.
F). Secure with (items 14, 15, 16).
G). Using the torque specifications on page 6,
tighten all reflector and mount hardware,
with the exception of the 1 / 2" carriage
bolts (they will be tightened in section III)
15
4096-224
1.8M SERIES 1184

Advertisement

Table of Contents
loading

Table of Contents