CPI SATCOM & Antenna Technologies
1 / 2" Nuts
Elevation Rod
Elevation Block
1 / 2" Hardware
Elevation Block
Positioner
Reflector Support Tube
[ 5 ]
[ 6 ]
Hardware
# 10
Asm
Positioner
STEP 9:
A). Loosen 1 / 2" nuts on elevation rod
to allow movement of the elevation
block.
B). Slide elevation block down the
elevation rod and position the block in
between the small tabs on the
positioner so that the holes in both
block and tabs are aligned.
STEP 10:
A). Secure elevation block to positioner
with 1 / 2" hardware set aside in step 7
STEP 11:
A). Remove (2) #10 screws and washers
from reflector support tube.
B). Attach elevation marking plate (item 6)
to support tube as shown with spacers
(item 5) and #10 hardware.
Note placement of spacers (item 5).
C). Tighten only until lockwashers are
flattened.