CPI 1184 Series Assembly Manual page 11

Table of Contents

Advertisement

CPI SATCOM & Antenna Technologies
To Satellite (within +/- 10
Ground Cable
(If Required)
3 / 4" Nuts
1 / 2" Hardware
Azimuth
Tube
)
Positioner
Assembly
Canister Screws
Lock Nuts
Mast Pipe
Azimuth
Rod
Azimuth Tube
Canister Plate
1 / 2" Hardware
STEP 3:
A). Place positioner assembly onto mast
pipe.
B). Orient the positioner assembly
approximately towards the center of
the satellite orbital arc to within +/- 10
as shown.
C). Securely tighten [8] canister screws.
Note: A grounding cable (if required)
can be attached to any of the
canister screws.
D). Tighten [8] lock nuts against canister.
STEP 4:
A). Locate azimuth rod (step 1.) and loosen
the 3 / 4" nuts to allow movement of the
azimuth tube.
B). Remove 1 / 2" hardware from azimuth
tube and set aside.
STEP 5:
A). Locate end hole on canister plate.
B). Position azimuth tube in hole and secure
with 1 / 2" hardware from step 4.
11
4096-224
1.8M SERIES 1184

Advertisement

Table of Contents
loading

Table of Contents