Nuvation Energy High-Voltage BMS - Installation Guide
Figure 2. Mechanical Drawing of Stack Controller

3.3. Electrical Connections

The Stack Controller module has 7 connectors. Each connector is described in the following sections
in detail.

3.3.1. Link Out

The Link Out connector provides power and communication to the Cell Interface modules. The
amount of current supplied by this connector is the sum of current consumed by all Cell Interface
modules in the system. Connect the Cell Interface module which is measuring the most negative cell
in the stack to this connector.
Document ID: NE-IG-001
5
Rev 2.1, 2020-03-13