4.2. Stack Switchgear Electrical Connections
Before making any connections, ensure that the service disconnect in
the OFF position.
The Stack Switchgear is configured for a specific battery topology based on the
details provided to Nuvation Energy during order fulfillment. Failure to use the same
number of Cell Interface modules and/or using a different battery topology will result
in undesirable Stack Switchgear behavior.
+ Please contact
design that would require a Stack Switchgear configuration update.
4.2.1. Getting Started
▪
Step 1: Ensure system is de-energized
▪
Step 2: Ground the Stack Switchgear
▪
Step 3: Connect Power In
▪
Step 4: Connect Fan Control
▪
Step 5: Connect E-Stop
▪
Step 6: Connect to external PC
▪
Step 7: Connect Cell Interface Link bus
▪
Step 8: Connect Battery Stack and DC Bus
Below is a overview image of the external interfaces available on the front of the Stack Switchgear.
Document ID: NE-PM-003
support@nuvationenergy.com
Figure 11. Stack Switchgear external interfaces
Nuvation Energy High-Voltage BMS - Product Manual
if there is a change in the system
15
Figure 11
is in
Rev 1.2, 2021-03-03
Curie Update 1