Download Print this page

Raisecom ISCOM6820-GP Quick Installation Manual

Hide thumbs Also See for ISCOM6820-GP:

Advertisement

Quick Links

Statement
This document is a guide to simple and convenient hardware installation. Please read it carefully before installation to
prevent bodily injury or device damage.
The device installation personnel must be well trained before installation to master correct installation operations and
safety precautions.
Device installation shall follow local safety regulations. Precautions listed in this document are suppliments to local
safety regulartions. Raisecom shall not be liable for any accidents if common safety operation requirements are
violated, or design, manufacturing, or usage security standards for devices are violated.
High-voltage safety
Do not install or remove the device when it is powered on, to prevent unpredictable bodily injury.
Use special tools instead of common tools when conducting operations in high voltage and AC power conditions.
Keep the device away from moisture. Once the device is dampened, power it off immediately.
Grounding safety
Ensure correct grounding before installing cables. Avoid installing the device before it is grounded.
Laser safety
Before cutting or welding the fiber, disconnect the fiber and the optical source.
Do not stare into the laser output interface to avoid eye injury.
Power cable safety
Turn off the power or disconnect the power before installing/removing power cables.
Make sure that the label of the power cable is correct before connecting the power cable.
Use a qualified power cable. Do not use a power cable that fails to meet the specifications.
1

Advertisement

loading

Summary of Contents for Raisecom ISCOM6820-GP

  • Page 1 Device installation shall follow local safety regulations. Precautions listed in this document are suppliments to local safety regulartions. Raisecom shall not be liable for any accidents if common safety operation requirements are violated, or design, manufacturing, or usage security standards for devices are violated.
  • Page 2: Electrostatic Discharge Safety

    Description Package check Before installing the device, check whether the device model and auxiliary parts in the package box comply with the Packing List. If not, contact Raisecom local office or dial our hotline for technical support. Installation scenario ...
  • Page 3 1. Install cage nuts. The ISCOM6820-GP is 2U high. Therefore, you have to make an installation plan first to reserve enough space for device installation. 2. Mark the position of the guide rail. Install guide rails or tray before installing the ISCOM6820-GP in the cabinet.
  • Page 4 4. Install brackets. Install brackets on the device according to the bracket installation holes at both sides of the device. 5. Slide the device into the cabinet slowly. 6. Secure the device to the cabinet with screws.
  • Page 5 1. Remove the blank panel. 2. Install components. 3. Insert components steadily. 4. Tighten the captive screws. 5. Uplift the fan to the fan slot on the left side of the chassis, 6. Uplift the dust screen to the dust screen slot on the left push it into the slot, and then tighten the captive screws on side of the chassis, push it into the slot, and then tighten the the fan.
  • Page 6 1. Insert the DC power connector into the power interface on the power card. 2. Tighten the screws on the connector. 3. Connect the other end of the DC power cable to a DC Power Sourcing Equipment (PSE).  Do not reverse the polarity of the DC power supply.
  • Page 7 Method Test the DC power with a multi-meter. Ensure that the voltage is from -38.4 to -57.6 VDC. Use a tester. The power capacity should be able to support the ISCOM6820-GP runing at the maximum power View. consumption. Test the ground resistance of the power cable and ground terminal. The value should not be Use a tester.

This manual is also suitable for:

Iscom6820-gp a