Signal And Power Connections - PAC R6000S Operation Manual

Table of Contents

Advertisement

Figure 2.
Detector In: Detector Module
3. Connect "Detector Vent" fitting on the back of the detector module to the inlet side of the
Hopcalite/Drierite scrubber tube and the outlet of the scrubber tube to the "Argon IN" fitting ("Dryer IN"
fitting on newer instruments, following figure) on the back of the furnace module. The inlet side of the
scrubber tube is the Hopcalite (black material) if the scrubber tube is not marked.
Figure 3.
Dryer In: Furnace Detector Module
4. If necessary, plumb the vent fittings on the back of each module with separate lines to a safe location
at atmospheric pressure.
2.2.3

Signal and Power Connections

1. Connect the 4-20 mA and/or 0-10V monitoring devices to the signal out terminal block that is located
on the back of the detector module, following figure.
PAC L.P., All Rights Reserved, 2015
R6000S Operation Manual: Rev. G
Page 37 of 92

Advertisement

Table of Contents
loading

Table of Contents