Starting Up The System; Evacuating The Refrigerant Circuit And Carrying Out A Pressure Test - Panasonic Aquarea WH-ADC0309J3E5 Planning And Installation Manual

Air-to-water heat pumps
Hide thumbs Also See for Aquarea WH-ADC0309J3E5:
Table of Contents

Advertisement

Installation
6
6.9

Starting up the system

Commissioning of the system covers the evacuation of the refrigerant circuit (only for bi-bloc
systems), filling the water system, the concluding inspection of the system installation, test run as
well as system handover and instruction of the customer.

6.9.1 Evacuating the refrigerant circuit and carrying out a pressure test

i
Note
In the case of mono-bloc systems, you can skip this section. Continue with section →
the heating or cooling circuit, p.
188
8. Mount the cabinet top part back on the cabinet bottom part by first placing the top part with
the two upper claws (16) on the bottom part and then pressing the bottom edge of the top
part carefully against the bottom part, until the two bottom claws (17) latch.
9. For mono-bloc systems: Wall mounting is now concluded.
For bi-bloc system: Replace the cover of the detached remote controller (20) in the front
panel (18) of the indoor unit by the cover for the remote controller opening (21), supplied
within the scope of delivery, to seal the opening (19). Exercise caution as you press the
cover, until the six latching hooks (22) engage on the front panel.
F
16
17
F Mounting top/ bottom part
16 Top claws
17 Bottom claws
G
U P
20
G Front panel indoor unit
18 Front panel of the indoor unit
19 Remote controller opening
20 Removing the cover of the dismounted remote controller
21 Inserting the cover for the remote controller opening
22 Latching hooks (total 6)
191.
Aquarea air-to-water heat pumps - Planning and installation manual - 02/2022
18
19
21
22
6.9.2.2 Filling

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents