Installing An Nvme U.2 Pass-Thru Card - IBM Power System 9009-22G Manual

Nvme u.2 pass-thru cards
Hide thumbs Also See for Power System 9009-22G:
Table of Contents

Advertisement

Attention: Operating the system without the service access cover on for more than 10 minutes
when the system power is turned on might damage the system components.
Figure 3. Removing the service access cover
Installing an NVMe U.2 pass-thru card in the 9009-22G or 9223-22S system
To install an NVMe U.2 pass-thru card in the system, complete the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Lift each air baffle (A) straight up.
See Figure 4 on page 7.
Place air baffles upside down on a clean area. When you turn an air baffle over, hold the detachable
drive cover to prevent it from coming loose.
6 Power Systems: NVMe U.2 pass-thru cards for the 9009-22G or 9223-22S

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system 9223-22s

Table of Contents