IBM Power System 9009-22G Manual page 9

Nvme u.2 pass-thru cards
Hide thumbs Also See for Power System 9009-22G:
Table of Contents

Advertisement

• Do not put any load on the slide-rail mounted equipment mounted in the installation position.
• Do not leave the slide-rail mounted equipment in the installation position.
(L002)
(L003)
or
or
or
or
Safety notices ix

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system 9223-22s

Table of Contents