System Set-Up - Intec FORCE 5250 Instruction Manual

Insulation blowing machine
Table of Contents

Advertisement

Set up and Operation

SYSTEM SET-UP:

INITIAL OPERATION
During initial operation, install the Fresh Air Inlet Kit for the VANGUARD Engine and Blower.
a. Cut a 8" diameter hole into the side wall or floor of your truck / trailer. NOTE: be sure to
cut in a non-load bearing area.
b. Mount the Outside Plate (on the outside of the truck) and Inside Plate (on the inside of the
truck) – sandwiching the wall or floor -- with four nuts.
c. Hose Ring: The Hose Ring will mount to the Inside Plate.
T: 303-833-6644
Original Language - English
The FORCE 5250's agitation system is built strong to last. Using an
advanced design for rugged durability and superior product
conditioning. This design allows product to go through multiple stages
of conditioning prior to installation.
Main Agitator- fluted section allows for maximum mobility and
break-up of product.
Fluted section transitions to breaker bar section where rapid cycling
begins to transition product into smaller pieces.
Shredder Bars continue to pulverize product to proper conditioning.
Inside Plate
Instruction Manual
Outside Plate
www.inteccorp.com
|
7

Advertisement

Table of Contents
loading

Table of Contents