System Set -Up - Intec Force/2 Instruction Manual

Insulation blowing machine
Hide thumbs Also See for Force/2:
Table of Contents

Advertisement

 
 
 
Backflow pre
B
eventer:  Th
i
s positioned
d between th
f
flowing back
kwards throu
p
product in th
he hose is m
examples inc
e
clude (i) hos
some dense 
s
pack operat
 
 
Underside vi
U
ew of FORC
 
 
 
 
 
 
 
 
 
S
Set up a
nd Oper
 
     
System Set
S
t‐Up:
    
Set system o
S
on a dry, leve
1. Obta
in appropria
a
. Recomme
to cut ins
 
T
T:  303‐83
33‐6644 
O
Original Languag
ge ‐ English 
e backflow p
preventer (o
he blower an
nd airlock.  T
ugh the airlo
ock and into 
ore than tha
at of the pre
e moving str
raight up fro
tion.  The ba
ck blow pre
E/2 
ration 
 
el surface.  
ate protectiv
ve equipmen
endations:  d
  dust mask, e
ulation bags
s, and a hat.
 800‐666
6‐1611
o
or
or one‐way v
valve) is foun
The backflow
w preventer 
the blower w
which may h
essure in the
e line betwee
om machine 
to a second
venter prolo
ongs the blo
nt.  
 eye protecti
on, gloves, k
I
Instruction M
nd in the ba
se of the sys
will keep ins
sulation from
happen whe
en the pressu
en the blowe
er and airloc
d or third sto
ory, or (ii) du
wer motor's
s life.  
 knife 
www
w.inteccor
Manual
|
5
stem and 
ure of 
ck ‐  
uring 
rp.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents