System Operation - Intec FORCE 5250 Instruction Manual

Insulation blowing machine
Table of Contents

Advertisement

SYSTEM OPERATION:

1. Energize System
a. Pull EMERGENCY STOP BUTTONS out (i.e. into the ON position).
Start VANGUARD engine
1. Place choke in the ON position if engine has not been running.
2. Turn key to START position and release once engine starts.
3. Reduce choke when engine is warming up until choke is in the OFF position.
4. Move engine throttle to FULL position.
2. Rotate the ROTARY CONTROL SELECTOR SWITCH to the desired method to operate system.
T: 303-833-6644
Original Language - English
VANGUARD engine shown prior to the installation of the Hose Ring as part of the Fresh Air Inlet Kit.
Instruction Manual
Choke
Ignition Switch with Keys (2)
Throttle
Oil Quick Drain
hose & valve
www.inteccorp.com
|
9

Advertisement

Table of Contents
loading

Table of Contents