Vivo MOUNT-VP01B Instruction Manual
Vivo MOUNT-VP01B Instruction Manual

Vivo MOUNT-VP01B Instruction Manual

Black projector ceiling mount
Hide thumbs Also See for MOUNT-VP01B:

Advertisement

Quick Links

Black Projector Ceiling Mount
Instruction Manual
SKU: MOUNT-VP01B
Scan the QR code with your mobile device or follow the link
for helpful videos and specifications related to this product.
https://vivo-us.com/products/mount-vp01b
GET IN TOUCH | Monday-Friday from 7:00am-7:00pm CST
help@vivo-us.com
www.vivo-us.com
Chat live with an agent!
309-278-5303

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MOUNT-VP01B and is the answer not in the manual?

Questions and answers

Summary of Contents for Vivo MOUNT-VP01B

  • Page 1 Black Projector Ceiling Mount Instruction Manual SKU: MOUNT-VP01B Scan the QR code with your mobile device or follow the link for helpful videos and specifications related to this product. https://vivo-us.com/products/mount-vp01b GET IN TOUCH | Monday-Friday from 7:00am-7:00pm CST help@vivo-us.com www.vivo-us.com...
  • Page 2 Outside Diameter CAUTION! DO NOT INSTALL INTO DRYWALL ALONE. VERIFY YOUR CEILING CONSTRUCTION. USE WOOD STUDS TO MOUNT. We include mounting for brick and concrete If unsure, please contact us at vivo-us.com, email at help@vivo-us.com, or call us at 309-278-5303.
  • Page 3 TOOLS NEEDED DO NOT EXCEED WEIGHT CAPACITY. 30lbs Failure to do so may result in serious injury. (13.61kg) Phillips Drill Screwdriver ASSEMBLY STEPS STEP 1 OPTION A: Above Ceiling Cable Management If cables will be hidden above the ceiling, route cables through large opening in Ceiling Mount (A). OPTION B: Below Ceiling Cable Management If cables are located below ceiling, route cables through the side of Ceiling Mount (A).
  • Page 4 STEP 2 OPTION A: Wood Ceiling Joist Installation Align holes in ceiling plate with wood ceiling joist and mark drilling locations. Use of a stud finder is recommended for finished ceilings. Drill 55mm (2.2”) deep holes using 4.5mm or 3/16” drill bit. Secure Ceiling Mount (A) to stud using ST6x56 Screws (W-A) with M6 OD-16 Washers (W-C).
  • Page 5 STEP 3 Align arms on Mounting Bracket (B) with mounting holes in projector, and secure to projector using Screws (M-A through M-D) and Washers (M-E through M-H) most appropriate for your projector. If your projector has 3 mounting holes, simply remove one of the arms. M-A, M-B, M-C, M-D M-E, M-F, M-G, M-H STEP 4...
  • Page 6 STEP 5 Secure Mounting Bracket (B) using M5x12 Screws (M-I), M5 OD-10 Washers (M-J) and M5 OD-10 Plastic Washers (M-K). Tighten with 4mm Allen Wrench (T-A).
  • Page 7 STEP 6 Adjust angle and rotation of projector using 4mm Allen Wrench (T-A). -15° 15° +15° -15°...
  • Page 8 : 1HR 8M (within office hrs) - 23% within < 15m - 38% within < 30m - 61% within < 1hr - 83% within < 2hr - 92% within < 3hr FOR MORE VIVO PRODUCTS, CHECK OUT OUR WEBSITE AT: www.vivo-us.com...

Table of Contents