careful not to trap air bubbles. Immediately wipe off any
spilled sealing compound.
Figure 5. Adding sealing compound
Screw conduit domed-cover back onto conduit opening.
Note: Initial setup of sealing compound will occur in
approximately 30 minutes. However, the sealing compound
requires a minimum of 8 hours above 32ºF (0ºC) to develop
sufficient strength to withstand explosions.
Note: Wires must be kept separated as shown in the figure
before addition of the sealing compound.
Electric Connection Check
Points
Have proper connections been made at the junction
box?
Is the junction box lid fastened tightly to the junction box?
Are all wire connections secure?
Are the service conductor sizes adequate to carry rated
load?
Is the unit properly grounded?
Is the unit connected to a properly fused branch circuit?
12 | Installation
Explosion-Proof and Flammable Materials Storage Laboratory Refrigerators and Freezers

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vwh07cfsa

Table of Contents