Lower Counterweight Installation/Removal; Drain Pump Installation/Removal; Picture 6.109 Lower Counterweight Installation/Removal; Picture 6.110 Drain Pump Installation/Removal - Beko Arcelik BLG15 C7S Service Manual

Table of Contents

Advertisement

Lower Counterweight Installation/Removal

6.20
Front wall is removed.
Lower Counterweight Retaining Bolts are removed. (During the installation of upper
and lower counterweights, torque value must be 1900 Ncm (-200 tolerance).

Picture 6.109 Lower Counterweight Installation/Removal

Drain Pump Installation/Removal

6.21
 Remove the upper table.
 Panel is removed.
 Front wall is removed.
 Screws on the body are removed. Picture 6.122.
 Clamp at the pump inlet of the discharge hose is pulled backwards.
 Remove cable.
 Pump is removed.

Picture 6.110 Drain pump Installation/Removal

Sensitivity: Public
BLG15 C7S SERVICE MANUAL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents