Poly V Belt Installation; Picture 6.100 Vektör Card; Picture 6.101 Belt Installation - 1; Picture 6.102 Belt Installation - 2 - Beko Arcelik BLG15 C7S Service Manual

Table of Contents

Advertisement

Picture 6.100 vektör card

Poly V Belt Installation

6.17

Picture 6.101 Belt installation - 1

Picture 6.102 Belt installation - 2

Picture 6.103 Belt installation - 3

Sensitivity: Public
BLG15 C7S SERVICE MANUAL
Seat the drum belt on the
motor shaft gear to attach it
onto the drum.
Check if the belt is centered on
the drum.
If the belt is not centered with
the drum, make the installation
by attaching the belt to the
tooth on the motor shaft which
it centers.
Make sure that the drum with
the belt centers the drum (not
closer than 1.5mm to the drum
edge) by rotating it 2-3 turns
minimum.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents