Checking After Power-On (Recommended) - Ruijie RG-S3250E Series Installation Manual

Table of Contents

Advertisement

The console cable is correctly connected; the terminal (can be a PC) used for configuration is already started;
the parameters are already configured.

4.2.2 Checking after Power-on (Recommended)

After power-on, you are recommended to perform the following checks to ensure the normal operation of follow-up
configurations.
Check that information is displayed on the terminal interface.
Check that the device indicator is normal.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RG-S3250E Series and is the answer not in the manual?

This manual is also suitable for:

Rg-s3250e-24Rg-s3250e-48

Table of Contents