Installation; Location Selection - FineTek EE310 Operation Manual

Electromechanical level measuring system
Table of Contents

Advertisement

5.2.2. Don't pull and drag the cable wire or hammer the weight head as it will damage the product.
5.2.3. When installing the product at 3 m above ground or higher, it is suggested to operate with hoist.

6. Installation

6.1. Location Selection

6.1.1. Installation position should be away from the inlet or outlet of reservoir at least 1.2 m, and avoid
locations interfering with the conveying system to avoid damage to the facility.
6.1.2. Reservoir or tank equipped with observation window is suggested; it will be beneficial for
future maintenance. The installation location should be away from the ladder, frame or any
protrusion. The minimum distance between the EEX center and tank wall should be 1m
or more.
> 1m
6.1.3. Must be located away from the inlets flow direction to avoid the cable and hammer being damaged
by material or disconnected or buried.
> 1.2m
8