Non Combustible Flushed Finishing; Remove Top Nailing Strips & Standoffs; Installation Access Panel - Regency Greenfire GF900C Owners & Installation Manual

Hide thumbs Also See for Greenfire GF900C:
Table of Contents

Advertisement

installation

NON COMBUSTIBLE FLUSHED FINISHING

UNIT ASSEMBLY/ FINISHING/ MANTEL CLEARANCES + MANTEL LEG CLEARANCES
REMOVE TOP NAILING STRIPS & STANDOFFS
Remove the top nailing strip/standoff by removing 4 screws in locations
shown in Diagram to the right, then lift off and recycle.
Break off the 7 standoffs with a pair of pliers.

INSTALLATION ACCESS PANEL

The unit is equipped with a removable access panel for pre-finish installation
of optional components - this panel is located on the lower front face.
1. Remove 4 screws to remove access panel.
2. Easier access to gas connection with panel removed.
3. Install any optional components with access panel removed.
4. Reinstall access panel, line up 2 upper tabs and secure in place with
4 screws.
Note: Access panel is no longer usable/accessible once facing material
installed.
14
Remove 7 standoffs
Tab locations on access panel
Installation Access Panel
Regency GF900C-2 Gas Fireplace

Advertisement

Table of Contents
loading

Table of Contents