Vega EL 2 Operating Instructions Manual page 13

Conductive probe
Table of Contents

Advertisement

Conductive probe EL 2 •
1
4
Fig. 7: Mounting of the additional electronics for line break monitoring
1
Connection to terminal 1 (ground terminal)
2
Connection to terminal 2 (measuring electrode)
3
Additional electronics for line break monitoring
4
Outer ground terminal
If you are using a probe without additional electronics for line break
monitoring, a fault signal will be triggered.
Keep in mind that in case of a fault signal also the switching output
will be activated.
Only failures of channel 1 are monitored.
Take note of the operating instructions manual of the controller.
5 Connecting to power supply
2
3
13

Advertisement

Table of Contents
loading

Table of Contents