Wiring - LEGRAND NUMERIC HP i 33 40 kVA Series User Manual

Table of Contents

Advertisement

Step 6 Move the UPS from the wooden bracket to the ground and align the bottom installation hole with the
expansion bolt and screw the bolts.
Step 7 Reinstall the bottom cover plates.
4.4.2

Wiring

Step 1 Open the front door of the UPS, remove the bottom wiring cover plate, as shown in Figure 4-12.
Note:
The bottom wiring cover plate position of the UPS is the same.
CAUTION
The battery +, - and neutral wire terminal of 40 kVA (/B) UPS, are all at the back
of the UPS, before wiring, dismantle the rear bottom wiring cover plate.
Figure 4-12. Remove bottom wiring cover plate
36

Advertisement

Table of Contents
loading

Table of Contents