New Holland Speedrower 200 Service Manual page 70

Self-propelled windrower
Table of Contents

Advertisement

29. Connect overflow hose (1) and tighten clamp.
30. Fill radiator with proper coolant. Recommended mix-
ture is 50% water with 50% ethylene glycol antifreeze.
Replace the 0.88 bar (13 psi) radiator cap (1).
31. Fill overflow bottle with coolant to COLD mark. As ma-
chine is run and shut down, refill bottle as necessary
to replace coolant used replacing evacuated air bub-
bles.
32. Connect red #56 cable (1) to B+ terminal, yellow
#FM112 wire of harness to 5 mm terminal, W (2)
and orange #FM053 wire to 4 mm terminal D+ (3) of
alternator. Install three nuts.
NOTE: Terminal posts W and D+ have metric threads. Do
not attempt to use inch series nuts on these terminals. An
M5 nut is used at W, and an M4 nut is used at D+.
33. Connect wire #058 white, to starter terminal. Connect
all positive power cables to starter terminal (1) and
tighten nut to 12 - 18 N·m (9 - 13 lb ft).
34. Arrange wiring harness around engine as original and
install clamps in position to protect harness from dam-
age in operation.
Engine - Engine and crankcase
47698329 14/04/2014
10.1 [10.001] / 18
24
50041838
25
86075190
26
76075207

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Speedrower 240

Table of Contents