DeDietrich Innovens MCA 160 Manual page 24

High-efficiency wall-hung gas boilers
Hide thumbs Also See for Innovens MCA 160:
Table of Contents

Advertisement

4 Before installation
Fig.22
3 LV boilers
1
2
1 System water supply; connection DN 65/DIN 2631 (4
holes)
2 System return; connection DN 65/DIN 2631 (4 holes)
3 Gas supply connection DN 65/DIN 2633 (4 holes)
Air supply 150 mm
Flue gas outlet 150 mm
A System flow centre line = 330 mm up to 350 kW and
560 mm above 350 kW
24
MCA
Configuration drawing for 3 boilers - LV
325 305
1940
1860
30
600
C
630
630
1890
183
676
226
3
125
630
325
B System return centre line = 210 mm to 350 kW and
200 mm above 350 kW
C Low-loss header; DN 65 connection with adapter to
DIN 100 = 361 mm to 350 kW and 701 mm above
350 kW
AD-4100008-01
7680446 - v.01 - 14082017

Advertisement

Table of Contents
loading

Table of Contents