DeDietrich Innovens MCA 160 Manual page 26

High-efficiency wall-hung gas boilers
Hide thumbs Also See for Innovens MCA 160:
Table of Contents

Advertisement

4 Before installation
Fig.24
5 LV boilers
1
2
C
1 System water supply; DN 100/DIN 2631 connection
(4 holes)
2 System water supply; DN 100/DIN 2631 connection
(4 holes)
3 Gas supply connection DN 65/DIN 2633 (4 holes)
Air supply 150 mm
26
MCA
Configuration drawing with 5 boilers - LV
3200
3120
30
600
630
630
630
3150
325 305
183
3
630
630
Flue gas outlet 150 mm
A System flow centre line = 560 mm
B System return centre line = 200 mm
C Low-loss header; DN 100 = 633 mm connection
676
226
125
325
7680446 - v.01 - 14082017
AD-4100010-01

Advertisement

Table of Contents
loading

Table of Contents