Glossary - Eaton 5P750RC Installation And User Manual

Hide thumbs Also See for 5P750RC:
Table of Contents

Advertisement

6. 2 Glossary

Backup time
Time during which the load can be supplied by the UPS operating on battery power.
Battery test
Internal UPS test to check battery status.
Cold start
The devices connected to the UPS can be started even if AC input power is not
available. The UPS operates on battery power alone.
Deep discharge
Battery discharge beyond the permissible limit, resulting in irreversible damage
to the battery.
Load
Devices or equipment connected to the UPS output.
Low-battery
This is a battery-voltage level indicating that battery power is low and that the user
warning
must take action in light of the imminent break in the supply of power to the load.
Normal AC
The AC-power line supplying the UPS under normal conditions.
input
Percent load
Ratio of the power effectively drawn by the load to the maximum output of the UPS.
Personalisation
It is possible to modify certain UPS parameters set in the factory. Certain UPS
functions can also be modified by the software to better suit user needs.
Programmable
Controllable outlets for automatic load shedding, remote shutdown and sequential
Outlets
restart (personalised using software).
UPS
Uninterruptible Power System.
UPS ON/OFF
This function enables or disables initiation of UPS ON/OFF control sequences by
controlled by
computer power-management software
software
5P 750VA-1. 5 KVA US_EN
Page 22

Advertisement

Table of Contents
loading

This manual is also suitable for:

5p1000rc5p1500rc

Table of Contents