ABB eVD4 Engineering Manual page 39

Breaker integrated protection rbx615
Table of Contents

Advertisement

1MRS757255 B
Breaker Integrated Protection RBX615
Engineering Guide
GUID-28FD832E-DE8C-49B4-8065-39491F80EBAD V1 EN
Figure 16:
Updating data flow
After the update, the GOOSE inputs are shown in Project Navigator
submenu under LD0/LLN0/Inputs in the receiving IED.
GUID-B20F09F5-0917-4990-8AF3-002B2D875B8C V1 EN
Figure 17:
GOOSE inputs show under the Inputs submenu.
5.
Repeat the drag-and-drop operation for every IED receiving data from the
selected GOOSE control block.
Deleting a GOOSE input
1.
Select the IED in the Client IED box.
2.
Press Delete and confirm the deletion by clicking Yes.
Section 5
GOOSE
31

Advertisement

Table of Contents
loading

Table of Contents