G-3. Install or Replace the Ba eries of Gas/Water Valve Controller
With a li ing/prying ac on on the two clamp latches, open the cover on the controller (due to the
rainproof design, this step may be slightly difficult)
Install
four
new
alkaline non-rechargeable
controller
Using the app, check the online status of the controller and verify there is no low-ba ery indicator
Reconnect the controller with the manipulator
1. Do not press the SET bu on during the en re ba ery installa on or replacement process
2. Do not mix old and new ba eries
O
pen
the cover
Install four new AA ba eries
AA ba eries
, and then close the
4 x AA
Close the cover
two clamps of the
41
Need help?
Do you have a question about the YS4909-UC and is the answer not in the manual?
Questions and answers