Yolink YS4909-UC Manual page 19

Gas/water valve controller
Hide thumbs Also See for YS4909-UC:
Table of Contents

Advertisement

D - 2 - 3 . H ow to C o n n ect t h e M a n i p u l ato r/ M o to ri zed Va l ve to t h e C o nt ro l l er
A er the manipulator/motorized valve is securely installed (all screws ght, etc.), refer to
1
"Install or Replace the Ba eries (Gas/Water Valve Controller)" sec on on page 41 for the
installa on of ba eries for the controller
Connect the manipulator/motorized valve to the controller
2
A er the connec on, proceed to page 23-25, for tes ng
Diagram (A): Connect
the manipulator to
the controller
Diagram (B): Connect
the motorized valve
to the controller
16

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the YS4909-UC and is the answer not in the manual?

Questions and answers

Table of Contents