Yolink YS4909-UC Manual page 13

Gas/water valve controller
Hide thumbs Also See for YS4909-UC:
Table of Contents

Advertisement

2. Get Ready
Turn the ball valve to OPEN status
1
(keep the center axis of ball valve
aligned to the water pipe)
Loosen the two screws on the two
2
handle-suppor ng bolts
L o o s e n t h e b ra c ket s i nto t wo
3
separate parts (carefully place the
two bolts aside)
10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the YS4909-UC and is the answer not in the manual?

Questions and answers

Table of Contents