Adjusting; Introduction Of Preset Programs - hatch A50B Operation Manual

Pressure steam sterilizer
Table of Contents

Advertisement

No.:GC-JS-21
To ensure the normal use of the sterilizer, the sterilizer cannot be delivered for use until the adjusting
work is successfully completed. The specific debugging steps are as follows:
4.1 Atmospheric pressure resetting
After the device is installed in the first time or moved, the atmospheric pressure needs to be reset.
Otherwise, the door may not open (E10, E11).
Steps for resetting the atmospheric pressure:
Open the door, turn off the power, wait for 20s, turn on the power, wait for 1 minute.
4.2 Date and time setting
Check the date and time are correct, if not correct, make adjustment, see chapter 6.1.4.2 The date
and time have been set when the device leaves the factory, usually no adjustment is required。
4.3 Leak test
The leak test is done to ensure the tightness of the sterilization chamber and its pipelines to ensure
that the cold air in the sterilization chamber is eliminated. This device comes with a leak test program,
the program is "vacuum test". Run this program in the cold state. After the test, the device will display
the test results. Can only be used after passing this test
The test results may be inaccurate when the sterilization chamber is hot, and must be
tested when the sterilization chamber is cold.
4.4 Sterilization parameter confirmation
Use chemical indicator test for preliminary sterilization parameter confirmation
This test requires a B-D test package or PCD test device
Put the B-D test package or PCD test device in the sterilization room, and place it on the lower
floor near the door. Run the B-D test program. After the program is completed, remove the test
package and observe the indicator paper. The indicator paper changes color evenly to the required
color to be qualified.
5.1 Parameters of preset programs
Sterilization
temperature
Program
(℃))
Version: 01/00

4. Adjusting

5. Introduction of preset programs

Holding time
(Min)
Effective date:2020-03-30
Drying time
Pre-vacuum
(Min)
times
Remarks
15

Advertisement

Table of Contents
loading

Table of Contents