Download Print this page

Mercia Garden Products 03WES1208-V3 Assembly Instructions Manual

Hide thumbs Also See for 03WES1208-V3:

Advertisement

Quick Links

General Instructions
03WES1208-V3
Wessex 12x8 Summerhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a
Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for up to 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufacturers recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03WES1208-V3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03WES1208-V3

  • Page 1 For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2 03WES1208-V3 Please retain product label and instructions for future reference Overall Dimensions: Width =2494mm Depth = 33616mm Height = 2298mm Base Dimensions: Width = 2379mm Depth = 3616mm Master Door Slave Door Window Before assembly Rail please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Step 2 Nail Bag Place the Plain Gable (No. 2) and Plain 20mm Screw x12 Panel (No. 7) onto the Floor. Secure the 50mm Screw x 65 Panels together with 3x50mm screws as 20mm Black Screw x10 40mm Screw x14 shown.
  • Page 4 Please retain product label and instructions for future reference Step 6 Step 4 Place the Veranda (No. 4) at the front of Fix the remaining Window panel (No. 8) and Plain Panel (No. 7) into position with the building. 3x50mm per panel. **Do not x to the Floor until the Roof is tted.
  • Page 5 Please retain product label and instructions for future reference Step 8 Step 10 Place a Roof panel (No. 3) onto the front Once the Roof and Roof B are on the of the building, making sure the Roof building, further secure the roofs rests into the gaps of the gable framing.
  • Page 6 Please retain product label and instructions for future reference Step 12 Step 14 Fix the Gable Trims (No. 16) to the build- Fix the Right hand side of the Roof in the same way. ing with 2x30mm screws per Trim. The Left handside may need to be Fix the Cover Strips (No.
  • Page 7 Please retain product label and instructions for future reference Step 15 Step 16 Fix the Rails (No. 9) to the building as Cut the Felt into 3 equal lengths and lay shown with; onto the roof as shown in the diagram. - 3x40mm screws through into the Making sure there is 50mm of overhang.
  • Page 8 Please retain product label and instructions for future reference Step 17 Step 19 Fix the remaining Cover Trims (No. 15) to Fix 3 Hinges (No. 23) to each Door the panel joins with 3x30mm screws per (No. 10 & No. 11) securing with 4x30mm trim.
  • Page 9 Please retain product label and instructions for future reference Step 21 Step 23 Fix the Finials (No. 26) to the building Fix the Press lock (No. 21) to with 2x30mm screws per Finial. the back of the Master door with 4x30mm screws. Making 4x30mm screws.
  • Page 10: After Treatment

    Please retain product label and instructions for future reference Step 25 Fix the Window Crosses (No. 17 & No. 18) into the windows securing with 6x20mm screws. Further secure the crosses with 10mm at each meeting point. 12x20mm screws. 6x10mm screws. 10mm 20mm Pre drill...