Download Print this page

Mercia Garden Products Wessex 03WES0808-V3 General Instructions Manual

8x8 summerhouse
Hide thumbs Also See for Wessex 03WES0808-V3:

Advertisement

Quick Links

General Instructions
03WES0808-V3
8x8 Wessex Summerhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm
sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm
above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan .
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Wessex 03WES0808-V3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products Wessex 03WES0808-V3

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 03WES0808-V3 Please retain product label and instructions for future reference Overall Dimensions: Width = 2494mm Depth = 2457mm Height = 2293mm Base Dimensions: Width = 2379mm Depth = 2395mm Before assembly please make sure you have a suitable base ready to erect your building Master Door QTY 1 Slave Door QTY 1...
  • Page 3 Please retain product label and instructions for future reference Step 1 Nail Bag Place the Floor (No. 5) onto a at, 50mm Screw x 32 20mm Screw x 18 level base, ensuring the base has suitable drainage, free from areas 40mm Screw x 18 20mm Black Screw x 14 where standing water can collect.
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 5 Place Window Panel (No. 3) against the Place the Veranda (No. 6) at the oor and the back Gable. front of the building, ush to the front of the Door Gable (No. 1). Fix the Window panel (No.
  • Page 5 Please retain product label and instructions for future reference Step 9 Step 7 Fix the Gable Trims (No. 15) to the Fix the Veranda Upright (No. 13) building with 2x30mm screws per Trim. to the building by screwing through the roof into the top of Fix the Cover Strips (No.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 11 Step 12 Fix the Rails (No. 8) to the building by: Cut the Felt (No. 24) into 3 sheets measuring: - Screwing 3x40mm screws down 2510mm (L) x 1000mm (W) through the rails into the veranda...
  • Page 7 Please retain product label and instructions for future reference Step 13 Step 14 x the Window (No. 11) into the Fix 3 Hinges (No. 20) to each Door Window Panel (No. 3), (No. 9 & No. 10) securing with x the Window Blocks (No.
  • Page 8 Please retain product label and instructions for future reference Step 18 Step 16 Fix the Press lock (No. 18) to the Fix the Finials (No. 23) to the back (internally) of the Master building with 2x30mm screws door (No. 9) with 4x20mm black per Finial.
  • Page 9 Please retain product label and instructions for future reference Step 20 Locate the Window Crosses (No.16 & No.17) into the windows. Fix by screwing through the Cross into the Window framing using 6x20mm screws, as shown in the diagram. Further secure the crosses by screwing 1x10mm screw at each meeting point, as shown in the diagram.
  • Page 11 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...