Download Print this page

Mercia Garden Products Wessex 03WES1008-V3 General Instructions Manual

10x8 summerhouse
Hide thumbs Also See for Wessex 03WES1008-V3:

Advertisement

Quick Links

General Instructions
03WES1008-V3
Wessex 10x8 Summerhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of
heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also
occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be
avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended
periods of warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The
cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least
25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting
or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Wessex 03WES1008-V3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products Wessex 03WES1008-V3

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 03WES1008-V3 Please retain product label and instructions for future reference Overall Dimensions: Width = 2494mm Depth = 3064mm Height = 2298mm Base Dimensions: Width = 2379mm Depth = 3001mm Before assembly Master Door QTY 1 Slave Door QTY1 Window QTY 2 Roof B QTY2 please make sure you have a suitable base ready to erect your...
  • Page 3: Pre-Assembly

    Please retain product label and instructions for future reference Nail Bag Step 1 Place both Floor panels (No. 5) framing 50mm Screw x 63 20mm Screw x 36 side up onto a at, level base, ensuring the base has suitable drainage, free from 40mm Screw x 18 20mm Black Screw x 10 areas where standing water can collect.
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 5 Place one Window Panel (No. 4) Fix the Door Gable (No. 1) into position against the oor and the back with 3x50mm. Gable. **Do not x to the Floor until the Roof Fix the Window panel (No.
  • Page 5 Please retain product label and instructions for future reference Step 7 Step 9 Fix the Roof Supports (No.20) to the Place Roof panel B (No. 12) onto Gable Framing with 3x40mm screws the rear of the building, making per Roof support. sure the Roof rests into the gaps of the gable framing.
  • Page 6 Please retain product label and instructions for future reference Step 13 Step 11 Fix the Veranda Upright (No. 14) to Fix the building to the Floor with 4x50mm screws per panel. the building by screwing through the roof into the top of the framing using 16x50mm screws.
  • Page 7 Please retain product label and instructions for future reference Step 15 Step 14 Fix the Rails (No. 8) to the building by: Fix the Gable Trims (No. 16) to the building with 2x30mm screws per - Screwing 3x40mm screws down Trim.
  • Page 8 Please retain product label and instructions for future reference Step 17 Step 16 Fix the remaining Cover Trims Cut the Felt (No. 29) into 3 sheets (No. 15) to the panel joins with measuring: 3x30mm screws per trim. 3120mm (L) x 1000mm (W) and lay onto the roof in the order Trims may require cutting down shown in the diagram.
  • Page 9 Please retain product label and instructions for future reference Step 21 Step 19 Fix the Finials (No. 26) to the Fix 3 Hinges (No. 23) to each Door building with 2x30mm screws (No.9 & No.10) securing with 4x30mm per Finial. black screws per hinge.
  • Page 10 Please retain product label and instructions for future reference Step 23 Step 20 Fix the Press lock (No. 21) to the Locate the Window Crosses (No.17 & No.18) back of the Master door with into the windows. 4x30mm screws. Making sure to align the key holes.
  • Page 11 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back P 11...
  • Page 13 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...