Mercia Garden Products 03VER0808-V2 General Instructions Manual

Mercia Garden Products 03VER0808-V2 General Instructions Manual

8x8 vermont summerhouse

Advertisement

Quick Links

General Instructions
03VER0808-V2
8x8 Vermont Summerhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be a ected during various weather conditions. For the duration of
heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur
during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided
but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The
cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least
25mm above the surrounding ground level to avoid ooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting
or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan .
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 03VER0808-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03VER0808-V2

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 03VER0808-V2 Please retain product label and instructions for future reference Overall Dimensions: Roof Support Bar - 28 x 28 x 2304mm Length = 2411mm Width = 2484mm FS2828-2304 Finial QTY 2 Height = 2569mm SHED DIAMOND FINIAL Eaves Frame - 28 x 28 x 1195mm QTY 4...
  • Page 3 Please retain product label and instructions for future reference Step 3 Pre Assembly Secure the barrel bolts to the top & Remove the transportation blocks from bottom of each side door and the the bottom and top of each panel slave door using 6x10mm screws.
  • Page 4 Please retain product label and instructions for future reference Step 5 Step 4 Fix the corners with 50mm Place the oor panels upside down screws as shown in the onto a rm and level base. Ensure illustration. the base has suitable drainage, free from areas where standing water Do not secure the building can collect.
  • Page 5 Please retain product label and instructions for future reference Step 7 Step 9 Place the gable tops onto the window Attach 2x eaves frames to panels, ensuring the boards interlock. the long side of each roof sheet, ensuring the frames Secure in place using 4x50mm screws are ush to the edges, per gable top, screwing in an alternating...
  • Page 6 Please retain product label and instructions for future reference Step 13 Step 11 Attach the fascia’s and nial’s Cut the felt into 3 strips of 2500mm to the the front and back of the length and place onto the roof, as building using 12x40mm screws.
  • Page 7 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 16 Step 15 Screw through the side panel exter- Place the Door support bar (No. 24) nally in line with the 2 x 1 framing to the inside of the door panel as using 1 x 70mm screw in either side displayed on the pictures.
  • Page 8 Please retain product label and instructions for future reference Step 17 Step 19 Attach the two turn buttons to the it is recomended that after the It is ESSENTIAL that you apply wood treatment immediately after the building slave door at the top and bottom construction, treatment and the has been assembled.

Table of Contents