Download Print this page

Mercia Garden Products 03WES0808-V3 General Instructions Manual

8x8 wessex summerhouse
Hide thumbs Also See for 03WES0808-V3:

Advertisement

Quick Links

General Instructions
03WES0808-V3
8x8 Wessex Summerhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a
Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for up to 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufacturers recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan .
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03WES0808-V3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03WES0808-V3

  • Page 1 For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2 03WES0808-V3 Please retain product label and instructions for future reference Overall Dimensions: Width = 2494mm Depth = 2457mm Height = 2293mm Base Dimensions: Width = 2379mm Depth = 2395mm Before assembly please make sure you have a suitable base ready to erect your...
  • Page 3 Please retain product label and instructions for future reference Step 2 Place the Plain Gable (No. 2) and Plain Panel (No. 4) onto the Floor. Secure the Pre Assembly Panels together with 3x50mm screws as shown. Remove the transportation blocks from the bottom and top of each panel **Do not x to the Floor until the Roof is before beginning assembly...
  • Page 4 Please retain product label and instructions for future reference Step 4 Step 6 Fix the Door Gable (No. 1) into position Place a Roof panel (No. 7) onto the build- ing, making sure the Roof rests into the with 3x50mm screws. gaps in the framing in the front and back panel.
  • Page 5 Please retain product label and instructions for future reference Step 8 Step 10 Place the Right Roof (No. 7) onto the Fix the building to the Floor with building, making sure the Roof rests into 4x50mm screws per panel. the gaps in the framing on the front and back panel.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 13 Step 12 To x the Window (No. 11) into the panels Cut the Felt into 3 equal lengths and lay that accomodate a window.
  • Page 7 Please retain product label and instructions for future reference Step 15 Step 17 Fix the Fasicas (No. 12) to the building Fix a Ring Pull (No. 19) to each door with with 3x30mm screws per Fascia. 4x20mm black screws per Finial. 12x30mm screws.
  • Page 8: After Treatment

    Please retain product label and instructions for future reference Step 19 Fix the Turn Buttons (No. 21) to the top of each door with 1x20mm black screw per Button. 2x20mm black screws. 20mm Pre drill screw hole It is ESSENTIAL that you apply wood treat ment immediately after the building has been assembled.