Download Print this page

Advertisement

Quick Links

General Instructions
Overlap
Shiplap
Cladding
Cladding
03WES0808-V1
8x8 Summerhouse, T&G Roof and Floor, Double Doors, Opening Window and Veranda
03WES1008-V1
10x8 Summerhouse, T&G Roof and Floor, Double Doors, Opening Window and Veranda
03WES1208-V1
12x8 Summerhouse, T&G Roof and Floor, Double Doors, Opening Window and Veranda
Refer to the instructions pages for you speci c product code
Fixed
Opening
Windows
Windows
Please retain product label and instructions for future reference
N/A
No
Solid Sheet
Floor
Windows
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are coated with a water based high quality colorant**; this only
helps to
protect the product during transit and for up to 3 months against mould. To
validate your guarantee and ensure longevity of the product, it is ESSENTIAL the
building is treated with a wood preserver within the rst three months of
assembly and thereafter in accordance with the manufactures recommenda-
tions.
Care must be taken to ensure the product is placed on a suitable base
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer
to diagrams for the base dimensions, The base should be slightly smaller than
the external measurement of the building, i.e. The cladding should overlap the
base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products
independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
T&G Floor
Solid Sheet
Roof
x2
All building's should be erected by two
adults
For ease of assembly, you must pilot
drill all screw holes and ensure all
screw heads are countersunk.
2mm Drill bit
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces
of the timber. You are strongly advised
to wear gloves when working with or
handling rough sawn timer.
For Assistance Please
Contact Customer Care on
01636 880514
www.merciagardenproducts.co.uk
T&G Roof
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03WES1008-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03WES1008-V1

  • Page 1 Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2 03WES1008-V1 Fixing Kit Please retain product label and instructions for future reference Overall Dimensions: Veranda Support - 27x44x1685mm Qty 2 Length = 3422mm Width = 2830mm Height = 2252m Base Dimensions: Fascia - 12x95x1549mm Qty 4 Length = 3124mm Width = 2413mm...
  • Page 3: Pre-Assembly

    Please retain product label and instructions for future reference Step 1 Pre Assembly Remove transportation Fix a Thinge to the top and bottom of each blocks from the bottom door and a hinge in the middle and x to of each panel before the door gable using 30mm black screws.
  • Page 4 Please retain product label and instructions for future reference Step 2 Step 4 Fix the door beading Place floor on firm and level base, ensure base has strips to the door gable suitable drainage free from areas where water can using 4x40mm screws collect.
  • Page 5 Please retain product label and instructions for future reference Step 8 Step 6 Connect two roof panels together using Fix the corners with 50mm the u channel. Lay two roofs upside screws as shown in diagram. down on the ground and place the u channel over the two central roof frames.
  • Page 6 Please retain product label and instructions for future reference Step 10 Step 12 Once the roof is fixed attach Secure the Veranda rails to the the building to the floor with outside edge of the veranda 50 mm screws ensuring that floor and to the building.
  • Page 7 Please retain product label and instructions for future reference Step 15 Step 14 Fit the fascias to the roof Cut the felt into 3 sheets at 3500mm and fix over the felt and secure in onto the roof using felt tacks as shown in place with 40mm screws as diagram ensuring there is 50mm overhang shown.
  • Page 8 Please retain product label and instructions for future reference Step 16 Step 17 Fix the casement stay to the 30mm opening window then align screw the fixings onto the window panel frame. Ensure the case- Place the opening window strip 11mm above the window gap in the ment stay fits into fixings when window panel and fix with 3x30mm...
  • Page 9: After Treatment

    Please retain product label and instructions for future reference Step 18 Step 21 Pre drill hole Attach the Tower Bolt Strip to Attach a turn button to the top 30mm screw top and bottom of the slave door and bottom of the slave door with 2x30mm screws.