Operation; Startup; Shutdown; Pressure Relief Procedure - Graco E-Flo EC1140 Instructions-Parts List Manual

Dc 4-ball pumps, sealed or with open wet cup
Table of Contents

Advertisement

Operation

Operation
Operation

Startup

Startup
Startup
To operate the pump, follow the Startup instructions
for the Basic or Advanced motor in the Motor manual.
The Advanced E-Flo DC motors require installation of
the 24P822 Control Module Accessory Kit to provide
the interface for users to enter selections and view
information related to setup and operation. See the
Control Module Accessory Kit manual for installation
and operation information.
Run the pump at a slow speed until the fluid lines are
primed and all air is forced out of the system.

Shutdown

Shutdown
Shutdown
Follow the
Pressure Relief Procedure, page
3A3384B
All manuals and user guides at all-guides.com
13.
Pressure Relief
Relief Procedure
Procedure
Pressure
Pressure
Relief
Procedure
Follow the Pressure Relief Procedure
whenever you see this symbol.
This equipment stays pressurized until pressure is
manually relieved. To help prevent serious injury
from splashing fluid and moving parts, follow the
Pressure Relief Procedure when you stop spraying
and before cleaning, checking, or servicing the
equipment.
1. Disengage the start/stop control (C). See Fig. 1.
2. Shut off and lock out the fused safety switch (B).
3. Open the fluid drain valve (D), having a waste
container ready to catch drainage. Leave open
until you are ready to pressurize the system
again.
Operation
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-flo ec1141E-flo ec1142E-flo ec1150E-flo ec1151E-flo ec1152E-flo ec1160 ... Show all

Table of Contents