Defender 3000 Indicators
2.
Unscrew the two screws on the sealing cover (circled), take out the cover, and then take out the first layer
of the built-in housing.
3.
Release the load cell connector (circled) on the bottom of the indicator and then pass the load cell cable
through it.
4.
Connect all the cables on the load cell cable to the load cell terminal block on the mainboard (circled).
Please refer to the Load Cell Terminal Block section for details of the connections.
EN-15