Mounting Into An Industrial Cabinet (With Slide Rails) - Kontron Embedded Computers KISS 4U User Manual

Table of Contents

Advertisement

Slide Rails (Option)

Mounting into an Industrial Cabinet (with Slide Rails)

1. Ensure that the sides of the industrial cabinet are parallel and that the sides of
the KISS 4U chassis are parallel and square to the industrial cabinet.
2. Using mounting kits and brackets, mount the brackets to the outer part of the
slide rails (see Fig. 27a, pos. 4 ). Screw the back brackets on loosely.
3. Install the slide rails into the industrial cabinet.
4. Mount the inner part (see Fig. 27a, pos. 3 ) of the slide rails to the chassis.
5. Insert the KISS 4U-Platform into the industrial cabinet.
6. Check for even and smooth movement of the chassis.
7. If binding occurs, or slide movement is not satisfactory:
Loosen the screws on the rear mount brackets and adjust the brackets.
Loosen the screws on the chassis side.
Cycle the unit a few times.
If movement has improved tighten the screws and cycle again.
44
KISS - User's Manual (V1.10)

Advertisement

Table of Contents
loading

Table of Contents