CEBORA S.p.A.
♦ Replace the control (47) and/or power board (56).
♦ Make sure that the gas lines of Power Source are not clogged and, if necessary, perform the
PLASMA GAS PRESSURE TEST of par. 3.3.9..
♦ Check for the correct opening of solenoid valve V03 (13)(27 Vac on coil terminals) in cutting
operation.
♦ Check for torch condition, wear conditions of electrode, diffusers and nozzle.
♦ Check the wiring between terminals TP6 of power board (56), choke (35), HF transformer
(50) and electrode terminal on central adapter (41). If you find loose connections, tighten and
replace any damaged components.
♦ Check the wiring between J1 of power board (56), nozzle resistor (33), contactor (55),
terminal J4 on sensor board (52) and between terminal J2 on sensor board (52) and nozzle
terminal on central adapter (41). If you find loose connections, tighten and replace any
damaged components.
3.302.269
Correct?
YES
NO
25
12/04/2012