Post-Installation Check - Endress+Hauser Ceraphant T PTC31 Operating Instructions Manual

Process pressure measurement
Hide thumbs Also See for Ceraphant T PTC31:
Table of Contents

Advertisement

Ceraphant T PTC31, PTP31, PTP35
3.2.1 Mounting instructions
• Do not mount the device in the product flow or at a point where it could be affected by
pressure pulses
• Calibration and functional testing are easier if the device is mounted downstream of a shut-off
assembly
• The orientation of the Ceraphant T can result in zero point shift, i.e. in an unpressurised state,
the measured value does not display zero. This zero point shift can be corrected - see
"Operation" section
• The on-site display can be rotated electronically 180° - see "Operation" section
• The housing can be rotated up to 310°
• Process connection G ½A, flush mounted, max. torque 40 Nm (with PTP31)
3.3

Post-installation check

After installing the device, carry out the following checks:
• Are all screws firmly tightened?
Endress+Hauser
Installation
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ceraphant t ptp31Ceraphant t ptp35

Table of Contents